Take modular down because
- of the condition of the modular
- you have space within the building to absorb the students
- you want to restore the building to a good condition
The action item should be an all inclusive package (removal of modular, restoration of grounds, re-wiring, etc. within the facilities).
No comments:
Post a Comment